Magnum operating with one train for now


Wednesday, 30 May 2007


Cedar Point officials are not sure when Magnum XL-200 will get a full load again.

The roller coaster was shut down Saturday after a train loaded with people bumped into the back of another train sitting on the tracks outside the loading station.

Read more from the Sandusky Register

Discuss this story at CP Place