Wicked Twister 2

Photos

Electrical cable
Back of track end stopper
Top horizontal support of front spike
Final forward LIM's with back spike in background
Looking backward toward station
Top two front spike track sections
Giant Wheel, with the tubs off in the off-season
Construction site from behind Disaster Transport
Spools of electrical cable
Maintenance deck for back spike
Back spike and aquatic stadium
Breakers Hotel and Magnum down the beach
Inside back spike track
Back spike track
Back spike stopper at end of track
Platform entry ramp
Station, sans roof
Top two back spike track sections
Launch track before roof, with front spike
Back spike as seen from aquatic stadium
Incomplete rear spike
Incomplete rear spike
Top two rear spike track sections
Looking down the launch track from behind the station
Incomplete rear spike