CP&LE

June '92 finds Maude L. being readied for operation on the second train, having been pulled out of the house by the railroad's gas-hydraulic Plymouth switcher, #7.  Copyright 2005, Paul W. Woodring

June '92 finds Maude L. being readied for operation on the second train, having been pulled out of the house by the railroad's gas-hydraulic Plymouth switcher, #7. Copyright 2005, Paul W. Woodring
(Sunday, 26 February 2006)

Part of these albums: CP&LE